Project: CHENGLINGJI
CHINA 1998 / 99
2 NEUERO Stationary Pneumatic Unloaders 100 t/h each
2 fixed pneumatic unloaders mounted on a floating pier, with capacity of 100 t/h each, 16,5 m suction boom and telescopic range of 6,0 m. This system will replace an heavy mechanical system that will be dismantled. Both unloaders will be operated from a cabin located between the unloaders. Each unloader will feed a belt conveyor that will feed the main conveyor that connects the floating pier to the land. Both unloaders will be interlocked with a central control panel for entire Grain Terminal. Each unloader is divided in boom together with a filter column and the sound insulated machinery house where 2 single-stage blowers connected in series supply the necessary air flow to the unloading system.