| ||||||
|
Article
Project: MATOLA SILOMozambique 1997NEUERO commissioned end of 1997 a 250 tph Multiport at Matola Silo in Mozambique. The equipment is electric powered via cable drum. The product feeds a 30.000 t Silo via belt conveyors where the product is weighed. The unloader is equipped with a separate sluing crane. The Matola Silo was funded by KfW Germany and is the biggest and newest Bulk Grain Terminal in Mozambique. The Multiport type of unloaders can also be supplied with direct feed to bagging stations or trucks.
|
|